Utility compliance form
Request for preliminary network advice
Request for service
Request for service marking
Special connection request
Supply abolishment
Application for miscellaneous electrical works
Application form - electricity network connection or alteration
Request for preliminary network advice - Greenfield estate
Application for provision of electricity network infrastructure - Greenfield estate
Routine and minor connections process guide
Large customer connection process overview
Large customer connection process
Application for dual supplies - construction sites
Application for dual supplies - electric vehicles
Damaged point of attachment fact sheet
Evoenergy electricity schedule of charges 2023-24 - Effective 1 July 2023
Evoenergy electricity schedule of charges 2022-23
Evoenergy electricity schedule of charges 2021-22
Evoenergy electricity schedule of charges 2020-21
Evoenergy electricity schedule of charges 2019-20
Evoenergy electricity schedule of charges 2018-19
Evoenergy electricity schedule of charges 2017-18
Electricity Customer Charter – Hindi
Electricity Customer Charter – Italian
Electricity Customer Charter – Simplified Chinese
Electricity Customer Charter – Spanish
Electricity Customer Charter – Traditional Chinese
Electricity Customer Charter – Vietnamese
Deemed standard connection contract - Electricity
Deemed standard connection contract - Gas
Model standing offer for basic connection services
Model standing offer basic connection services (Micro embedded generator)
Service and installation rules
Please note that Service and Installation Rules drawing 8913-213-06 has been updated and an additional POE drawing 8913-213-08 has been added.
Electrical safety tips
Low Voltage Testing Manual
Electrical safety rules
Application for connection of detached residential premises
Connection of residential premises terms and conditions
Non-basic residential connection terms and conditions
Application for natural gas meter relocation
Natural gas meter relocation terms and conditions
Natural gas meter location guide
Application for meter/service upgrade or downgrade
Connection alteration (meter upgrade or downgrade) terms and conditions
Application for decommissioning and meter removal
Decommissioning and meter removal terms and conditions
Application for pulse output connection
Pulse output connection terms and conditions
Application for medium density/high rise connection
Medium density/high rise terms and conditions
Application for connection to new industrial or commercial development
Connection to new industrial or commercial development terms and conditions
Model standing offer for basic connection services – Gas
Gas network schedule of prices 2023-24 - Effective 1 July 2023
Gas network schedule of prices 2021-22
Gas network schedule of prices 2020-21
Gas network schedule of prices 2019-20
Gas network schedule of prices 2018-19
Negotiation framework for negotiated contracts
Requirements for gas centralised hot water system
Service and installation rules
Please note that Service and Installation Rules drawing 8913-213-06 has been updated and an additional POE drawing 8913-213-08 has been added.
Evoenergy Service Performance Methodology
Evoenergy Gas Network - Service Performance as at 31 October 2023
Evoenergy Gas Network - Service Performance as at 30 September 2023
Evoenergy Gas Network - Service Performance as at 30 August 2023
Evoenergy Gas Network - Service Performance as at 30 July 2023
Evoenergy Gas Network - Service Performance as at 30 June 2023
Evoenergy Gas Network - Service Performance as at 31 May 2023
Evoenergy Gas Network - Service Performance as at 31 April 2023
Evoenergy Gas Network - Service Performance as at 31 March 2023
Evoenergy Gas Network - Service Performance as at 31 March 2023 1
Document category |
Document number | Document title |
---|---|---|
Network Connection Service/Supply Arrangements |
Temporary Installation, Residential Blocks O/H Supply |
|
Network Connection Service/Supply Arrangements |
Temporary Service Installation, Residential Blocks with U/G Supply Connection |
|
Network Connection Service/Supply Arrangements |
Galvanised Steel Service Pole |
|
Network Connection Service/Supply Arrangements |
Overhead Service and Point of Attachment (POA) Arrangement |
|
Network Connection Service/Supply Arrangements |
Unmetered Supplies, Servicing Arrangement, POE provided by Customer |
|
Network Connection Service/Supply Arrangements |
Unmetered Supplies, Servicing Arrangement, Direct Connection of Consumer mains |
|
Network Connection Service/Supply Arrangements |
Typical U/G & O/H Service Cable Conduit Requirement for Single Domestic or Commercial Installation |
|
Network Connection Service/Supply Arrangements |
Typical U/G Service Cable Conduit Requirement for installations Exceeding 100Amps per Phase |
|
Network Connection Service/Supply Arrangements |
Typical U/G Service Arrangement for POE / Meter Box in Boundary Fence / Wall |
|
Network Connection Service/Supply Arrangements |
Service Equipment Permissible Locations Domestic Installations |
|
Network Connection Service/Supply Arrangements |
Point of Connection Assembly, for Third Party Unmetered Assets, Low Voltage only Poles, LV Bare Mains |
|
Network Connection Service/Supply Arrangements |
Point of Connection Assembly, for Third Party Unmetered Assets, Low Voltage only Poles, LV ABC |
|
Minimum Clearance, Separation & Cover Requirements |
Minimum Clearance Insulated & Bare Overhead Conductors |
|
Minimum Clearance, Separation & Cover Requirements |
Separation & Cover Requirements for Cables and Plant |
|
Minimum Clearance, Separation & Cover Requirements |
Clearance Requirement for Swimming Pool from Electrical Infrastructure |
|
Minimum Clearance, Separation & Cover Requirements |
Planting & Structure Clearances Padmount Substation & Switching Stations |
|
Point of Entry Service Cubicles |
Typical Standard Meter Box Requirements |
|
Point of Entry Service Cubicles |
Non Domestic – Small Installations, POE / Meter Box for Installation with Underground Service Cable up to 50mm2 Cu |
|
Point of Entry Service Cubicles |
Typical Service Cubicle Multi-Installation for Radial and Looping or Paralleling of Evoenergy Cables |
|
Point of Entry Service Cubicles |
Dual Tenancy Switchboard Layout for 600 x 600 POE / Meter Box |
|
Point of Entry Service Cubicles |
Standard Switchboard Arrangement Domestic |
|
Point of Entry Service Cubicles |
Point of Entry Service Cubicle, 315A to 630A, Free Standing or Wall Mounted with Modular Feeder units |
|
Point of Entry Service Cubicles |
Point of Entry Radial Service Cubicle, 800A to 2000A, Free Standing or Wall Mounted |
|
Point of Entry Service Cubicles |
POE / Fuse Box for Domestic & Small Commercial Customers (16mm2 U/G Service) |
|
Point of Entry Service Cubicles |
Domestic POE Box / Enclosure Support Arrangement |
|
Point of Entry Service Cubicles |
Concrete Plinth Details for Point of Entry Cubicle |
|
Conduit and Trench |
Conduit Installation, Roadways & Driveways |
|
Conduit and Trench |
Underground Services in a Shared Trench - electrical pit requirement underground residential distribution with gas |
|
Conduit and Trench |
Underground Services in a Shared Trench - electrical pit requirement underground residential distribution without gas |
|
Conduit and Trench |
Cable trench details for Cable Installations not covered by Shared Trench |
|
Conduit and Trench |
Underground Service Conduit Requirements |
|
Cable pit and Pillar |
Cable Pit General Arrangement & Excavation Requirements |
|
Cable pit and Pillar |
Typical cable pit, type D240 load rating 3 way - with cable joints multiparts cover with 4 removable beams 15 parts (3X5) |
|
Cable pit and Pillar |
Typical cable pit, type D240 load rating 3 way - without cable joints multiparts cover with 2 removable beams 9 parts (3X3) |
|
Cable pit and Pillar |
Pillar Footing |
|
Cable pit and Pillar |
Alternate Earthing for LV Pits & Pillars |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy Zone Substations in ACT and NSW |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy Ground Assets in ACT and NSW |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy High Voltage Underground and Overhead Network Assets in ACT |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy Low Voltage Underground and Overhead Network Assets in ACT |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for UG & OH Transmission Line Assets in ACT |
|
Minimum Vegetation Clearance |
Fall in Hazardous Vegetation in ACT & NSW |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy High Voltage UG & OH Network Assets in NSW |
|
Minimum Vegetation Clearance |
Vegetation Clearance Requirements for Evoenergy Low Voltage UG & OH Network Assets in NSW |
|
Pad mount Substation and Switching Station |
Switching Station |
|
Pad mount Substation and Switching Station |
Switching Station Foundation |
|
Pad mount Substation and Switching Station |
Switching Station Earthing |
|
Pad mount Substation and Switching Station |
500-1500 kVA Padmount Substation |
|
Pad mount Substation and Switching Station |
Separate Earthing, 500-1500 kVA Padmount Substation |
|
Pad mount Substation and Switching Station |
500-1500 kVA Padmount Substation Foundation |
|
Pad mount Substation and Switching Station |
CMEN Earthing, 500-1500 kVA Padmount Substation |
|
Pad mount Substation and Switching Station |
CMEN Earthing with Grid, 500-1500 kVA Padmount Substation |
|
Pad mount Substation and Switching Station |
500-1500 kVA Twin Padmount 3 – 10m Separation Substation Foundation |
|
Pad mount Substation and Switching Station |
Separate Earthing, 500-1500 kVA Twin Padmount 3 – 10m Separation Substation |
|
Pad mount Substation and Switching Station |
CMEN Earthing, 500-1500 kVA Twin Padmount 3 – 10m Separation Substation |
|
Pad mount Substation and Switching Station |
CMEN Earthing with Grid, 500-1500 kVA Twin Padmount 3 -10m Separation Substation |
|
Pad mount Substation and Switching Station |
500-1500 kVA Padmount Substation Foundation Universal “H” Plinth |
|
Pad mount Substation and Switching Station |
500-1500 kVA Twin Padmount 3 – 10m Separation Substation |
|
Indoor/Chamber Substation |
One Transformer Indoor Substation Typical Layout |
|
Indoor/Chamber Substation |
Three Transformer Indoor Substation Typical Layout |
|
Indoor/Chamber Substation |
Two Transformer Indoor Substation Typical Layout |
|
Indoor/Chamber Substation |
Standard Substation “T” and “L” Trench Details |
|
Indoor/Chamber Substation |
Standard Substation Equipment Support Bracket and Trench Edge Framing |
|
Indoor/Chamber Substation |
Transformer Conduit Arrangement for Chamber Substations |
|
Indoor/Chamber Substation |
6 & 9 Way Conduit Entry to Chamber Substations Standard Configuration |
|
Indoor/Chamber Substation |
High Level HV Cable Conduit Entry to Chamber Substation |
|
Indoor/Chamber Substation |
High Level Conduits for Consumer Mains Entering Chamber Substations |
|
Indoor/Chamber Substation |
HV trench to LV trench conduit for Chamber Substations |
|
Indoor/Chamber Substation |
Chamber substation floor penetration cover plate – LV transformer tails |
|
Indoor/Chamber Substation |
Chamber substation floor penetration cover plate – HV transformer tails |
|
Indoor/Chamber Substation |
Inlet and Outlet Ventilators for Indoor Chamber Substations |
|
Indoor/Chamber Substation |
Standard Substation Haulage and Lifting Eye |
|
Indoor/Chamber Substation |
Transformer Safety Barrier |
|
Indoor/Chamber Substation |
Personnel Escape Door in Fire Rated Walls for Indoor Chamber Substation |
|
Indoor/Chamber Substation |
Equipment Door in Fire Rated Walls for Indoor Chamber Substation |
|
Indoor/Chamber Substation |
High Voltage Riser Door (Single) in Fire Rated Walls Indoor Substation |
|
Indoor/Chamber Substation |
High Voltage Riser Door (Double) in Fire Rated Walls Indoor Substation |
|
Indoor/Chamber Substation |
Louvre Door, Personnel Access & Escape (Single) |
|
Indoor/Chamber Substation |
Louvre Door, Equipment Access & Escape (Double) |
|
Indoor/Chamber Substation |
Fixed Louvres for Indoor Chamber Substation |
|
Indoor/Chamber Substation |
11kV Switchgear Trench Rail, Two Transformer Indoor Substation |
|
Indoor/Chamber Substation |
11kV Switchgear Trench Rail, Three Transformer Indoor Substation |
|
Indoor/Chamber Substation |
Standard Earth Grid Electrode Connection Details for Chamber Substations |
|
Indoor/Chamber Substation |
Indoor Substation Earthing Single Line Diagram |
|
Indoor/Chamber Substation |
Indoor Substation Earth Bar Connection Details |
|
Indoor/Chamber Substation |
Signs for Indoor Chamber Substations |
|
Indoor/Chamber Substation |
High Voltage Danger Sign for Chamber and Zone Substations |
|
Pole and Pole Stay |
Pole Foundation 9.5m Composite Poles |
|
Pole and Pole Stay |
Pole Foundation Concrete Poles |
|
Pole and Pole Stay |
Standard Stay on a Concrete or Composite Pole |
|
Pole and Pole Stay |
Aerial Stay on a Concrete or Composite Pole |
|
Pole and Pole Stay |
Sidewalk Stay on a Concrete or Composite Pole |
|
Evoenergy documents |
Electrical Safety Rules |
|
Evoenergy documents |
Service and Installation rules |
|
Evoenergy documents |
Underground Distribution Design Manual |
|
Evoenergy documents |
Chamber type substation design and construction standard |
|
Evoenergy documents |
Padmount Substation & Switching Station Siting Guide |
|
Evoenergy documents |
Low Voltage Point of Entry Cubicle Requirement |
|
Evoenergy documents |
Overhead Line Distribution Design Manual |
|
Evoenergy documents |
A Guide to Working Within Transmission Line Reservations |
|
Evoenergy documents |
Earthing Design Manual |
|
Evoenergy documents |
Technical specification – Electrical Conduit and Fittings |
|
Evoenergy documents |
Low Voltage Testing Manual |
|
Evoenergy documents |
Civil Works Manual Volume 2 |
|
Evoenergy documents |
Technical Specification – Quarry Products and Raw Materials |
|
Evoenergy documents |
Safe Work Around or Near the ACT Gas Network |
|
Evoenergy documents |
Instructions for Safe to Climb Test |
|
Evoenergy documents |
Installation Requirements for Telecommunication Equipment on Evoenergy Assets |
Loading power...