Electricity network service and installation rules
These Service and Installation Rules are to be read in conjunction with the Electricity Connection and Distribution Standard Customer Contract as published from time to time by Evoenergy. The contract applies to all customers connected to the network, other than customers who have negotiated an electricity connection and distribution contract, and requires compliance with these Service and Installation Rules.
Service and Installation Rules (Version 9)
Please note that Service and Installation Rules drawing 8913-213-06 has been updated and an additional POE drawing 8913-213-08 has been added.
Requirements for connection of Embedded Generators up to 5MW
Conduit Technical Standard
Installation Requirements for Telecommunication Equipment on Evoenergy Assets
Evoenergy Low Voltage Point of Entry Cubicle Requirements
Supply reliability targets
